Skip to main content

What type of quotation do you provide?

If you are at an early stage of purchasing a site or planning a development, we can provide you with an estimate of likely connection costs through a connection design and analysis study. You should be aware that a connection design and analysis study does not reserve network capacity for a particular project, and we cannot guarantee that a connection will be available when making a formal application for connection. 

If you have finalised your requirements and are ready to enter into a contract with us to provide your connection, we can give you a formal quotation. Click here to register for an Generation Connection application pack.

https://www.nienetworks.co.uk/connections/generation-connections