Connections For Generation FAQs General Questions What is the 11kV network? What is the maximum capacity machine you can connect to a single phase supply? What is the difference between micro, small scale and large scale renewable generation? What are the voltages on the network? What size are the overhead wires and how much electricity can I export? How much will a generation connection cost? What is NIE Networks doing to resolve network limitations? What is SCADA? Can I have multiple supplies at various points within my site / farm? Microgeneration Application What are limits for microgeneration? What is the difference between stage 1 and stage 2 G98/NI applications? What is the fit and inform process? What is defined as a close geographical region/area for microgeneration connections? Small Scale Generation Applications What is the connection process for small scale generators? What size of transformer is needed for small scale generation? What documentation do I need to send with my application? What type of quotation do you provide? When will I need to pay for my connection? I have submitted all the information required for a generation connection, what happens now? How long will it be before the extent of work required to connect my generator is known? What happens if I do not accept quotation for a the generation connection within the 90 day acceptance period? In order to provide my supply you will need to cross over a third party’s property. What are my options if this is refused? Can I pay an additional fee to enable my connection offer to be issued sooner?